Magni Meets Client - The Intervention at the Castelnuovo del Garda Tollbooth.
Magni TH offers reliable and versatile technological solutions to companies operating at large public construction sites. An example of this is the recent operation carried out at the new Castelnuovo del Garda freeway tollbooth, where SITTA S.r.l., a leading company in the road infrastructure sector, chose our Magni RTH 6.22 telescopic handler to support the complex construction operations.
The Words of Giancarlo Dettoni, Technical Director of SITTA S.r.l.
“The Magni RTH 6.22 that we are using at the construction site is used in several key activities, such as the installation and removal of metal panels, support for scaffolding and the installation of prefabricated structures, such as bilayers. With these we are constructing a canal serving the new highway tollbooth,” explained Giancarlo Dettoni, the company's technical director.
Among the valued features of the RTH 6.22 stand out:
- Load capacity and reach: essential to meet the needs of the construction site.
- Versatile attachments: specifically the winch for moving and lifting materials in confined areas and the platform for working at height.
- Advanced control systems: the LMI system enables graphical monitoring of reach and outreach, ensuring safe and efficient operations.
A Collaboration that Works
Due to the excellent performance and reliability of the RTH 6.22, SITTA S.r.l. has already planned to purchase a new Magni RTH 8.35 rotary telehandler for future projects. “We are extremely happy with this machine, both for its versatility and for the maintenance service offered by Magni.”
Magni Solutions for Yards at the Cutting Edge
SITTA S.r.l.'s experience shows how Magni TH solutions are designed to meet the most complex challenges on construction sites, ensuring safety, precision and efficiency. The RTH 6.22 telescopic handler proves to be an indispensable tool for those seeking superior performance and maximum versatility in operations.
Watch the video here: